| 
 
 
 To save time and labor costs, assembly is recommended to be carried out in the following order:– rings; – crankshaft;
 – pistons assembled with rods;
 – oil pump;
 – oil pallet;
 – head of cylinders assembled;
 – chain (belt) and natyazhitel;
 – pump of cooling liquid;
 – forward covers;
 – collectors;
 – cover of a head of cylinders;
 – back intensifying plate;
 – flywheel (drive plate).
 |