BMW 3 Series E30

since 1983-1994 release

Repair and operation of the car



BMW E30
+ 1. Maintenance instruction
+ 2. Maintenance
+ 3. Engine
+ 4. Cooling system
+ 5. Heating and ventilation
- 6. Fuel system
   6.2. Specifications
   6.3. Check of system of injection
   6.4. Air stream measuring instrument
   6.5. Throttle branch pipe
   6.6. Fuel pressure regulator
   6.7. Nozzle of launch of the cold engine and thermotimer
   6.8. Check and replacement of nozzles
   6.9. Air proofreader of idling
   6.10. Order of a decompression of fuel system
   6.11. Check of pressure of fuel
   6.12. The fuel pump, the pump of pumping and the fuel level sensor in a tank
   6.13. Fuel pipes and union
   6.14. Fuel tank
   6.15. Air filter
   6.16. Cable of the drive of a butterfly valve
   6.17. Carburetor
+ 7. Exhaust system
+ 8. Transmissions
+ 9. Coupling
+ 10. Brake system
+ 11. Running gear
+ 12. Body
+ 13. Electric equipment
+ 14. Useful tips


4ca876a9



6.5. Throttle branch pipe

GENERAL INFORMATION

Cable of an accelerator of automatic transmission (A), cable cruise control (V) and cable of the drive of a butterfly valve (C)

Check

PERFORMANCE ORDER
1. On completely cooled down engine remove the air cleaner and take an air duct aside.
2. Check completeness of opening of the gate, having asked the assistant to press a pedal. Check smoothness of the course of the gate.
3. During the abnormal operation of the gate replace a throttle branch pipe.

Removal and installation

PERFORMANCE ORDER
1. Disconnect the battery from weight.
2. Disconnect an air duct from a throttle branch pipe and take aside. In the photo the throttle branch pipe after removal of an inlet air offtake and a detachment of a hose from the proofreader of idling is shown.
3. Accurately designate and disconnect from a throttle branch pipe at first cables, then sockets and vacuum hoses. Merge about 1 l of liquid from the cooling system.
4. Turn out a broad tank and again turn, thereby having dumped residual pressure in the cooling system. Press and disconnect hoses of the cooling system (arrow), having weakened collars.
5. Turn off all bolts and nuts of fastening (arrow) and remove a throttle branch pipe. Muffle an opening in the mixing camera of a collector rags.
6. Installation is carried out upside-down. Tighten all bolts and nuts of fastening with the set moment. Adjust a cable of the drive of a butterfly valve.